Job description of the deputy for construction. Job description of the Deputy General Director for Construction. Qualification requirements of the Deputy Director for Capital Construction

Compiled in ___ copies. I approve _______________________________ (initials, surname) _________________________________ _______________________________ _________________________________ _______________________________ _________________________________ _______________________________ (name of the employer, (head or other person, his organizational and legal authority to approve the form, address, phone number, job description address) e-mail, OGRN, TIN / KPP) "___ "______ ___ y. N _____ "___" ____ y.

JOB INSTRUCTIONS for Deputy Director for Capital Construction

1. GENERAL PROVISIONS

1.1. This job description defines functional responsibilities, rights and responsibility of the Deputy Director for Capital Construction.

1.2. The Deputy Director for Capital Construction is appointed and dismissed in accordance with the procedure established by the current labor legislation by order of the head of the Organization.

1.3. The Deputy Director for Capital Construction reports directly to the head of the Organization.

1.4. A person who has a higher professional (technical) education and work experience in leadership positions in the field of capital construction for at least 5 years.

1.5. The Deputy Director for Capital Construction should know:

Legislative and regulatory legal acts, defining the directions of development of the relevant industry; administrative and regulatory materials of other bodies on issues of capital construction, as well as those relating to the activities of the enterprise;

Profile, specialization and features of the structure of the enterprise; technical and economic development enterprises;

Production capacity of the enterprise; fundamentals of production technology of the enterprise;

The procedure for the development and approval of capital construction plans as a section of the business plan of the enterprise;

Production technology and methods of conducting construction works; requirements for the organization of labor in the design of construction projects;

Financing procedure capital investments and attracting investors;

Building regulations; the procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of capital construction;

The procedure for concluding and executing economic and financial contracts;

Scientific and technical achievements in the relevant industry and the experience of advanced enterprises in the field of capital construction;

Economics, organization of production, labor and management; rules and norms of labor protection, safety measures, industrial sanitation and fire protection.

2. FUNCTIONAL RESPONSIBILITIES

Deputy Director for Capital Construction:

2.1. Ensures the performance of works on capital construction at the enterprise, targeted and rational use investment resources, directing funds for the technical re-equipment and reconstruction of the enterprise, their concentration on start-up facilities, reducing the volume of construction in progress.

2.2. He leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.

2.3. Leads the development of promising and current plans capital construction, reconstruction and expansion of the enterprise, as well as plans for the commissioning of fixed production facilities, areas and facilities, housing, communal and cultural facilities, drawing up applications for building materials and equipment for newly commissioned facilities, title lists for construction, provides performance of works provided for in the title lists, reduction of the payback period for capital investments.

2.4. Participates in the preparation of business plans in terms of technical re-equipment and increase in production efficiency, in determining the necessary financial resources, including funds from investors, for the construction, design and purchase of equipment, as well as sources of financing for capital investments, contractors for capital construction work in the conditions of market methods of managing.

2.5. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey and construction and installation work, with enterprises - for the purchase of materials and equipment.

2.6. Monitors the implementation of projects and construction organizations treaty obligations, in necessary cases imposes sanctions stipulated by the agreements, does not allow the application of building materials, parts and products that increase the cost of construction and do not meet standards and specifications.

2.7. Provides issuance of all necessary for development design and estimate documentation materials for construction and reconstruction projects. Coordinates design assignments and prepares them for approval by higher organizations.

2.8. Organizes the execution of banking operations under concluded agreements with customers and contractors and provides representation in deadlines the necessary documentation for the construction of facilities, performed by a contract or economic method.

2.9. Provides control over the timely issuance of design estimates and other technical documentation for the production of construction works, the targeted use of investment funds, over compliance with the established norms for the duration of construction and the deadlines for putting production capacities and fixed assets into operation, over the timeliness of fulfilling tasks for capital construction, over compliance with the requirements protection legislation environment, as well as technical supervision and control over the timing and quality of all construction and installation and other construction works, over their compliance with the approved design and estimate documentation, building codes and regulations, standards and specifications, safety standards, industrial sanitation and fire protection, labor organization requirements.

2.10. Coordinates with the bodies exercising technical supervision issues related to the installation, testing and registration of equipment on construction sites.

2.11. Controls the spending of funds allocated for the purchase of equipment in accordance with the title list, compliance with storage rules and the quality of conservation of uninstalled equipment.

2.12. Together with contractors, it carries out work on the delivery, acceptance and commissioning of objects completed by construction.

2.13. Promotes implementation rationalization proposals and improvements that reduce the cost and reduce construction time, reduce the payback period for capital investments (without reducing the strength of structures and deteriorating the quality of construction work).

2.14. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees employed in subordinate units. Organizes work on accounting and reporting on capital construction.

2.15. Supervises the work of the department (management) of capital construction and coordinates the activities of subdivisions subordinate to it.

3. RIGHTS

The Deputy Director for Capital Construction has the right to:

3.1. Get acquainted with the draft decisions of the head of the organization relating to the activities of the department headed.

3.2. Participate in the discussion of issues related to their performance official duties.

3.3. Submit proposals to the head of the organization to improve the activities of the headed department.

3.4. Liaise with the heads of other structural divisions of the organization.

3.5. Sign (vise) documents within their competence.

3.6. Make proposals to the management of the organization on encouraging distinguished employees, imposing penalties on violators of production and labor discipline.

3.7. Require the head of the organization to assist in the performance of their duties and rights.

4. RESPONSIBILITY

The Deputy Director for Capital Construction is responsible for:

4.1. For failure or improper performance their duties stipulated by this job description - in accordance with the current labor legislation.

4.2. For offenses committed during the period of its activities - in accordance with the current civil, administrative and criminal legislation of the Russian Federation.

4.3. For causing material damage- in accordance with the current legislation of the Russian Federation.

4.4. For violation of the Internal Rules work schedule, fire safety and safety regulations established in the Organization - in accordance with the current legislation of the Russian Federation.

5. WORKING CONDITIONS

5.1. The mode of work of the Deputy Director for Capital Construction is determined in accordance with the Internal Labor Regulations established in the Organization.

5.2. Due to operational needs, the Deputy Director for Capital Construction may go on business trips (including local ones).

5.3. In accordance with ____________________, the employer evaluates the performance of the Deputy Director for Capital Construction. The set of measures for evaluating the effectiveness was approved by _________ and includes:

- _____________________,

- _____________________,

- _____________________.

Job description developed on the basis of _______________________ ________________________________________________________________________________. (name, number and date of the document) Head of the structural unit ____________________________ _____________________ (initials, surname) (signature) "___" ________ ___ d. familiarized with the instruction: (or: received the instruction) ____________________________ _____________________ (initials, surname) (signature) "___" ________ ___

I. General provisions

1. The Deputy Director for Capital Construction belongs to the category of managers.

2. A person who has a higher professional (technical) education and at least 5 years of experience in managerial positions in the field of capital construction is appointed to the position of Deputy Director for Capital Construction.

3. Appointment to the position of deputy director for capital construction and dismissal from it is carried out by order of the director of the enterprise.

4. The Deputy Director for Capital Construction must know:

4.1. Legislative and regulatory legal acts that determine the direction of development of the relevant industry; administrative and regulatory materials of other bodies on issues of capital construction, as well as those relating to the activities of the enterprise.

4.2. Profile, specialization and features of the structure of the enterprise.

4.3. Prospects for the technical and economic development of the enterprise.

4.4. The production capacity of the enterprise.

4.5. Fundamentals of production technology of the enterprise.

4.6. The procedure for the development and approval of capital construction plans as a section of the business plan of the enterprise.

4.7. Production technology and construction methods.

4.8. Requirements for the organization of labor in the design of construction projects.

4.9. The procedure for financing capital investments and attracting investors.

4.10. Building regulations.

4.11. The procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of capital construction.

4.12. The procedure for concluding and executing economic and financial contracts.

4.13. Scientific and technical achievements in the relevant industry and the experience of leading enterprises in the field of capital construction.

4.14. Economics, organization of production, labor and management.

4.15. Rules and norms of labor protection, safety measures, industrial sanitation and fire protection.

II. Job Responsibilities

Deputy Director for Capital Construction:

1. Ensures the performance of work on capital construction at the enterprise, the targeted and rational use of investment resources, directing funds for the technical re-equipment and reconstruction of the enterprise, their concentration at start-up facilities, and reducing the volume of construction in progress.

2. Leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.

3. Manages the development of long-term and current plans for capital construction, reconstruction and expansion of the enterprise, as well as plans for the commissioning of fixed production facilities, areas and capacities, housing, communal and cultural facilities, drawing up applications for building materials and equipment for newly commissioned objects, title lists for construction, ensures the performance of the work provided for in the title lists, reducing the payback period for capital investments.

4. Participates in the preparation of business plans in terms of technical re-equipment and production efficiency, in determining the necessary financial resources, including investors, for the construction, design and purchase of equipment, as well as sources of financing capital investments, contractors for capital construction work in the conditions of market methods of managing.

5. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey and construction and installation work, with enterprises - for the purchase of materials and equipment.

6. Monitors the fulfillment of contractual obligations by design and construction organizations, if necessary, imposes sanctions under the contracts, does not allow the use of building materials, parts and products that increase the cost of construction and do not meet standards and specifications.

7. Ensures the issuance of all materials necessary for the development of design and estimate documentation for construction and reconstruction facilities.

8. Coordinates design assignments and prepares them for approval by higher organizations.

9. Organizes the execution of banking operations under concluded agreements with customers and contractors and ensures the submission of the necessary documentation for the construction of facilities, carried out by a contract or economic method, in a timely manner.

10. Provides control over:

10.1. The timeliness of issuing design estimates and other technical documentation for the construction work.

10.2. Target use of investment funds.

10.3. Compliance with the established norms for the duration of construction and the timing of the commissioning of production facilities and fixed assets.

10.4. Timely execution of tasks for capital construction.

10.5. Compliance with the requirements of environmental protection legislation.

11. Provides technical supervision and control:

11.1. For the timing and quality of all construction and installation and other construction works.

11.2. For the compliance of construction and installation works with the approved design and estimate documentation, building codes and regulations, standards and specifications, safety standards, industrial sanitation and fire protection, labor organization requirements.

12. Coordinates with the bodies exercising technical supervision issues related to the installation, testing and registration of equipment at construction sites.

13. Controls the spending of funds allocated for the purchase of equipment in accordance with the title list, compliance with storage rules and the quality of conservation of uninstalled equipment.

14. Together with contractors, it carries out work on the delivery, acceptance and commissioning of objects completed by construction.

15. Promotes the introduction of rationalization proposals and improvements that reduce the cost and reduce construction time, reduce the payback period for capital investments (without reducing the strength of structures and deteriorating the quality of construction work).

16. Ensures the introduction of progressive forms of labor organization, the expedient use of the professional and qualification potential of employees employed in subdivisions subordinate to him.

17. Organizes work on keeping records and reporting on capital construction.

18. Supervises the work of the department (management) of capital construction and coordinates the activities of subdivisions subordinate to it.

III. The rights

The Deputy Director for Capital Construction has the right to:

1. Act on behalf of the enterprise, represent the interests of the enterprise in relations with others structural divisions enterprises, organizations and public authorities on issues of capital construction.

2. Request and receive the necessary information from the heads of structural divisions of the enterprise and specialists.

3. Check the activities of the structural divisions of the enterprise subordinate to him.

4. Give instructions to the heads of structural divisions of the enterprise on issues of capital construction.

5. Within its competence, sign and endorse documents; to issue, under his signature, instructions on the enterprise on issues of capital construction.

Construction is an organizationally complex process. How to draw up a construction director's instruction correctly, taking into account these difficulties?

From the article you will learn:

The construction of a capital facility is not limited to work on the direct construction of the facility. It is necessary to perform a whole range of works prior to construction, as well as to perform the functionality during time erection of an object that is not directly related to the construction. It is simply impossible for one leader to embrace all these processes with his attention. Therefore, a specific executive responsible for the process of direct construction of the object.

Download related documents:

Don't miss: the main article of the month from leading specialists of the Ministry of Labor and Rostrud

A complete reference book of job descriptions for all sectors of activity.

Construction director position

There are a great many construction organizations: in terms of size, in the field of construction, in organizational and legal form. The structures of such organizations are also different, the staff list is compiled by the employer, the names of positions, their hierarchy, and the distribution of responsibilities are established by the enterprise. Therefore, the position can be called differently:

Deputy Director for Construction;

Deputy Director for Capital Construction;

construction director;

director of capital construction;

deputy CEO for construction and so on.

However, if we turn to the Qualification Directory for the positions of managers, specialists and other employees, approved by the Decree of the Ministry of Labor of Russia dated August 21, 1998 No. 37, we will see a description of the functionality of only one position - Deputy Director for Capital Construction. As stated in paragraph 4 of the Qualification Handbook, the specified functionality of employees serves as the basis for the development of job descriptions. instructions and labor contracts. At the same time, clarifications, additions and indication of other functional duties are allowed, depending on the specifics of a particular construction company.

Job description

In the general provisions section, the name of the position is indicated in accordance with staffing, subordination, requirements for the level of education, experience, qualifications.

The tasks of the construction director in most construction organizations are:

  • plan construction and manage its process;
  • provide construction work with technical documentation, materials, resources;
  • ensure safe working conditions during construction;
  • control the interaction of all departments and construction participants;
  • ensure quality control of construction.

The rights section indicates what powers the employee in this position has. For example, it could be:

obtaining information from other employees and structural units,

issuance of instructions or issuance of administrative acts (the circle of persons for whom such instructions will be mandatory for implementation is indicated),

conducting inspections, control measures (a list of specific actions that the employee is entitled to carry out as part of control and supervision is indicated),

negotiating and working on the conclusion of contracts and transactions (these powers may be provided for in a specially issued power of attorney. Then this power of attorney is referred to in the instructions, or described in this subsection, what powers the manager has, within what amounts he is allowed to conclude transactions and represent the interests of the company).

The division of responsibility is rarely specific. How rule, there is a reference that for violation of functional duties the head is brought to disciplinary, material, administrative or criminal liability. The procedures for bringing to responsibility themselves are provided for by law and it is inexpedient and problematic to describe them in the job description.

The most significant section is the description of the terms of reference. The more specific and closer to the activities of a particular enterprise this description is drawn up, the more important this document will be.

Most positions of this kind have the following functionality:

  1. Rational use of funds allocated for capital construction;
  2. Construction planning, control over the development of technical documentation;
  3. Concluding and maintaining contracts with contractors, suppliers of materials and equipment, monitoring the fulfillment of obligations under contracts;
  4. Management of construction works, ensuring the necessary approvals;
  5. Supervision over the safety of work performance, use of equipment and machinery;
  6. Organization of work on the delivery and acceptance of objects (intermediate stages of construction);
  7. Implementation of supervision over the quality of work, the quality of the supplied material and equipment;
  8. Reduction of objects of construction in progress;
  9. Working with credit organizations to make payments;
  10. Interaction with control and supervision authorities.

This is not a complete list of the functionality that the construction director performs. His duties can be more complete, formulated in more detail. Also, this amount of work can be distributed among several managers. For example, duties related to work with credit institutions, control financial flows, monitoring the use of investments and other financial responsibilities may be assigned to an individual specialist. Or the functionality of interaction with regulatory and supervisory authorities can also be assigned to a specially created management unit. Each construction company solves such issues differently, based on its potential, the number of employees, the presence of structural divisions and staffing.

The job description of the deputy director for construction is approved by the head of the organization, then the employee holding this position gets acquainted with it. In the employment contract, when indicating functional duties, a reference is made that they are indicated in the job description.


How to formulate job responsibilities

If with the wording common tasks and areas of activity, as a rule, there are no difficulties, then there are sometimes problems with the description of a specific type of authority. Here are some formulations of a narrower functionality that can be included in the job description. For example:

  1. overseeing the development of capital construction plans;
  2. participation in the process of acceptance of individual stages of capital construction with the right to sign acceptance documentation;
  3. signing written appeals, claims, acts of work performed under concluded agreements with suppliers, contractors and other counterparties, endorsement of invoices, signing construction documentation for all intermediate stages of construction;
  4. monitoring prices indicated in commercial offers potential suppliers of building materials and equipment;
  5. periodic revision of prices for purchased materials, equipment;
  6. verification of compliance by workers at construction sites with safety rules for construction work;
  7. control of structural divisions responsible for issuing construction sites to employees special means;
  8. making proposals to reduce construction costs, introducing new ways to reduce the cost of construction work, ways to optimize the use of equipment and work force;
  9. making proposals for organizational structure workers on construction sites;
  10. control over the timely conduct of safety briefings, etc.

Thus, the job description of the deputy director for construction is an important document in a construction organization. With the help of it, the distribution of a huge amount of functionality necessary for execution during construction is organized. From the job description, it becomes clear to other divisions of the enterprise on what issues to contact such an employee, what is part of his powers and duties. Thus, an organizational order is established, which is very important in matters of construction of facilities. The clearer the organization, the better will be the observance of deadlines and quality.


Download in.doc

I approve

___________________________________ (Surname, initials)

(name of company, ________________________

enterprise, etc., his (director or other

organizational- legal form) executive,

authorized

approve official

instructions)

» » ____________ 20__

Job description of the deputy director

for capital construction

______________________________________________

(name of organization, enterprise, etc.)

» » ____________ 20__ N__________

This job description has been developed and approved for

basis employment contract from __________________________________________

(name of the position of the person for whom

And in accordance with

this job description has been drawn up)

provisions Labor Code Russian Federation and other regulatory

acts regulating labor relations in the Russian Federation.

I. General provisions

1.1. The Deputy Director for Capital Construction belongs to the category of managers. Appointed to the position and dismissed from it by order of the director (manager) of the enterprise.

1.2. A person who has a higher professional (technical) education and at least _________ years of experience in managerial positions in the field of capital construction is appointed to the position of Deputy Director for Capital Construction.

The Deputy Director for Capital Construction reports directly to .

1.3. The Deputy Director for Capital Construction should know:

1) Legislative and regulatory legal acts that determine the direction of development of the relevant industry; administrative and regulatory materials of other bodies on issues of capital construction, as well as those relating to the activities of the enterprise.

2) Prospects for the technical and economic development of the enterprise.

3) Profile, specialization and features of the structure of the enterprise.

4) The production capacity of the enterprise.

5) Fundamentals of production technology of the enterprise.

6) The procedure for the development and approval of capital construction plans as a section of the business plan of the enterprise.

7) Production technology and construction methods.

8) Requirements for the organization of labor in the design of construction projects.

9) The procedure for financing capital investments and attracting investors.

10) Building codes and regulations.

11) The procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of capital construction.

12) The procedure for concluding and executing economic and financial contracts.

13) Scientific and technological achievements in the relevant industry and the experience of advanced enterprises in the field of capital construction.

14) Economics, organization of production, labor and management.

15) Rules and norms of labor protection, safety measures, industrial sanitation and fire protection.

16) _______________________________________________________________.

17) _______________________________________________________________.

II. Job Responsibilities

Deputy Director for Capital Construction:

2.1. Provides performance of works on capital construction at the enterprise, targeted and rational use of investment resources. Allocates funds for the technical re-equipment and reconstruction of the enterprise, ensures their concentration on launch facilities, and reduces the volume of construction in progress.

2.2. Leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.

2.3. Manages the development of long-term and current plans for capital construction, reconstruction and expansion of the enterprise, as well as plans for the commissioning of fixed production facilities, areas and capacities, housing, communal and cultural facilities, drawing up applications for building materials and equipment for newly commissioned facilities, title lists for construction, ensures the performance of the work provided for in the title lists, reducing the payback period for capital investments.

2.4. Participates in the preparation of business plans in terms of technical re-equipment and production efficiency, in determining the necessary financial resources, including investors, for the construction, design and purchase of equipment, as well as sources of financing for capital investments, contractors for performing capital construction work in conditions market methods of management.

2.5. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey and construction and installation work, with enterprises for the purchase of materials and equipment.

2.6. Monitors the fulfillment of contractual obligations by design and construction organizations, if necessary, imposes sanctions under the contracts, does not allow the use of building materials, parts and products that increase the cost of construction and do not meet standards and specifications.

2.7. Ensures the issuance of all materials necessary for the development of design estimates for construction and reconstruction facilities.

2.8. Coordinates design assignments in accordance with the established procedure and prepares them for approval by higher organizations.

2.9. Organizes the execution of banking operations under concluded agreements with customers and contractors and ensures the submission of the necessary documentation for the construction of facilities, carried out by contract or economic methods, in a timely manner.

2.10. Provides control over:

- timely issuance of design estimates and other technical documentation for construction work;

— targeted use of investment funds;

- compliance with the established norms for the duration of construction and the timing of the commissioning of production capacities and fixed assets;

— timeliness of fulfillment of assignments for capital construction;

— compliance with the requirements of the legislation on environmental protection.

2.11. Provides technical supervision and control:

– for the timing and quality of all construction and installation and other construction works;

— for the compliance of construction and installation works with the approved design and estimate documentation, building codes and regulations, standard and technical conditions, safety standards, industrial sanitation and fire protection, and labor organization requirements.

2.12. Coordinates with the bodies exercising technical supervision on issues related to the installation, testing and registration of equipment at construction sites.

2.13. Controls the spending of funds allocated for the purchase of equipment in accordance with the title list, compliance with storage rules and the quality of conservation of uninstalled equipment.

2.14. Together with contractors, it performs the delivery, acceptance and commissioning of completed construction projects.

2.15. Promotes the implementation of rationalization proposals and improvements that reduce the cost and reduce construction time, and also helps to reduce the payback period of capital investments without reducing the strength of structures and deteriorating the quality of construction work.

2.16. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees in subordinate units.

2.17. Organizes work on accounting and reporting on capital construction.

2.18. Supervises the work of the department (management) of capital construction and coordinates the activities of subdivisions subordinate to it.

2.19. _____________________________________________________________.

III. The rights DEPUTY DIRECTOR FOR CAPITAL CONSTRUCTION

The Deputy Director for Capital Construction has the right to:

3.1. Act on behalf of the enterprise, represent its interests in relations with organizations and public authorities on issues of capital construction.

3.2. Request and receive from the heads of structural divisions of the enterprise and specialists the necessary information.

3.3. To check the activities of the structural divisions of the enterprise subordinate to him.

3.4. Give instructions to the heads of the structural divisions of the enterprise on issues of capital construction.

3.5. Within its competence, sign and endorse documents; to issue, under his signature, instructions on the enterprise on issues of capital construction.

3.6. Independently conduct correspondence with the structural divisions of the enterprise, as well as other organizations on issues within its competence.

3.7. Make proposals to the director of the enterprise on bringing officials to material and disciplinary liability based on the results of inspections in accordance with the legislation of the Russian Federation.

3.8. ______________________________________________________________.

IV. Job Responsibility DEPUTY DIRECTOR FOR CAPITAL CONSTRUCTION

The Deputy Director for Capital Construction is responsible for:

4.1. For improper performance or non-performance of their official duties provided for by this job description - within the limits determined by the labor legislation of the Russian Federation.

4.2. For offenses committed in the course of carrying out their activities - within the limits determined by the current administrative, criminal and civil legislation of the Russian Federation.

4.3. For causing material damage - within the limits determined by the current labor and civil legislation of the Russian Federation.

4.4. ______________________________________________________________.

The job description was developed in accordance with ________________

(Name,

_____________________________.

document number and date)

Head of structural (initials, surname)

subdivisions (personnel service) _________________________

(signature)

» » _____________ 20__

(initials, surname)

_____________________________

(signature)

» » ________________ 20__

I am familiar with this job description: (initials, surname)

_________________________

(signature)

» » _____________ 20__

Alexander Lozhechkin, Head of Solutions Architecture at AWS EMEA Emerging Markets, says on his Facebook page. The editors of vc.ru publish the text with the permission of the author. Successfully passing an interview at Amazon is very difficult. Still work though...

Sberbank President German Gref believes that the learning process at school "kills every desire to learn." He stated this at the Eastern Economic Forum, RIA Novosti reports. Gref said that he, in particular, does not like the process of assessment and exams: “I ...

What can be the last straw in the behavior of a specialist? Maybe unfulfilled KPIs or systematic delays? It is best to learn about this firsthand - from managers who have repeatedly parted ways with employees. We asked entrepreneurs and...

Dmitry Voloshin Only every tenth employer is satisfied with the level of training provided higher education in Russia. Companies need to train their own personnel, ceasing to rely on the state and universities. You can’t just become in demand on the market ...

Vera Vitaleva, Elizaveta Muravyova Deloitte's seventh global study Global Human Capital Trends 2019, which was attended by about ten thousand people around the world, once again identified priority areas for working with personnel....

[legal form,
name of organization, enterprise]

[position, signature, full name of the head or other
official authorized to approve
job description]

[day month Year]

Job description of the head of a construction organization[name of organization, enterprise, etc.]

This job description has been developed and approved in accordance with the provisions of the Labor Code of the Russian Federation and other regulations governing labor relations in the Russian Federation.

1. General Provisions

1.1. The head of the construction organization belongs to the category of executives.

1.2. Appointment to the position of the head of a construction organization and dismissal from office is carried out by order of a higher organization or by decision of the owners.

1.3. The head of the construction organization conducts business on behalf of the owners of the organization.

1.4. A person with a higher professional (technical) education and at least 5 years of experience in managerial positions in the field of capital construction is appointed to the position of the head of a construction organization.

1.5. The head of the construction organization must know:

– legislative and regulatory legal acts, administrative and regulatory materials on capital construction issues;

– technical regulations for construction, building codes and regulations;

- profile, specialization and features of the structure of the construction organization;

- production capacity and human resources of the construction organization;

– organization of material and technical support of construction works;

- the procedure for the development and approval of capital construction plans;

– fundamentals of planning, strategic and operational planning;

– management theory, basics of production management, innovation management, basics financial management, personnel management;

– accounting and taxation in construction;

– requirements for environmental protection;

– fundamentals of economics, organization of production, labor and management;

– forms and systems of remuneration;

– the procedure for concluding and executing civil law contracts;

- the procedure for compiling and coordinating business plans for the production, economic and financial and economic activities of a construction organization;

- office work standards (classification of documents, procedure for registration, registration, passage, storage, etc.);

- the procedure for using computer technology, communications and communications;

– rules and norms of labor protection, safety measures, industrial sanitation and fire protection;

1.6. The head of the construction organization in his activities is guided by:

- this job description;

1.7. The head of the construction organization is accountable to [the founders of the organization represented by general meeting shareholders; another organ].

1.8. During the absence of the head of the construction organization (business trip, vacation, illness, etc.), his duties are performed by a deputy appointed in the prescribed manner, who is fully responsible for their high-quality, efficient and timely implementation.

1.9. [Enter as required].

2. Functions

The head of the construction organization performs the following functions:

2.1. Planning and management of the activities of the construction organization.

2.2. Coordination of interaction of structural divisions of the construction organization.

2.3. Distribution of duties and determination of the degree of responsibility of employees of a construction organization.

2.4. Monitoring compliance with work quality standards.

2.5. Identification and analysis of problems in the work of a construction organization and taking measures to resolve them.

2.6. Representing the interests of a construction organization in court, arbitration, state authorities and administration, as well as in relations with other business entities.

3. Job responsibilities

The head of the construction organization performs the following duties:

3.1. Manages, in accordance with applicable law, the economic and financial and economic activities of a construction organization.

3.2. Determines the measures and methods for solving the problems of a construction organization subordinate to him.

3.3. Ensures timely and high-quality execution of contracts, contracts, obligations by the construction organization.

3.4. Takes measures to provide the construction organization with qualified personnel, the rational use of their professional knowledge and experience, the creation of safe and favorable working conditions for life and health.

3.5. In accordance with labor legislation and the established procedure, he hires and dismisses employees, applies incentives or imposes penalties, and creates conditions for their professional growth.

3.6. Approves the internal labor regulations, vacation schedule, job descriptions, manufacturing instructions and other organizational and legal documents.

3.7. Coordinates the activities of divisions (services) of the construction organization.

3.8. Determines the pricing policy in the field of construction work.

3.9. Controls and ensures compliance with the law in the activities of a construction organization, timely payment of established taxes and fees, the correct combination of economic and administrative methods of management, unity of command and collegiality in discussing and resolving issues, moral and material incentives to improve the quality of construction work, applying the principle of material interest and responsibility of each employee for the work entrusted to him and the results of the work of the entire team, payment wages within the stipulated time.

3.10. Together with the labor collective, on the basis of the principles of social partnership, it ensures the development, conclusion and implementation of a collective agreement, compliance with labor discipline, promotes the development work motivation, initiatives and activity of workers of the construction organization.

3.11. Takes measures to comply with the requirements of environmental protection legislation when performing construction work.

3.12. Oversees:

– rational use of material, technical and labor resources, reducing costs and improving the quality of construction work;

– compliance with the rules and norms of labor protection and safety in the performance of construction work;

3.13. Issues orders (instructions) in all areas of activity of the construction organization.

3.14. Organizes accounting and provides reporting on the activities of the construction organization to the owner.

3.15. [other duties].

4. Rights

The head of the construction organization has the right:

4.1. Without issuing a power of attorney to act on behalf of the construction organization.

4.2. Represent the interests of the construction organization in relations with citizens, legal entities, public authorities and administration.

4.3. Dispose of the financial resources and property of a construction organization in compliance with the requirements determined by law, the charter of the organization, and other regulatory legal acts.

4.4. Open settlement and other financial accounts in banking institutions.

4.5. Make hiring and firing decisions.

4.6. Make decisions on submissions:

- on bringing employees who have violated labor discipline, guilty of causing material damage to the organization to material and disciplinary liability in accordance with the labor and civil legislation of the Russian Federation;

- on the moral and material encouragement of particularly distinguished employees.

4.7. Issue powers of attorney for civil law transactions, representation, etc.

4.8. Within the limits established by the legislation of the Russian Federation, determine the composition and scope of information constituting a trade secret, the procedure for its protection.

5. Responsibility

5.1. The head of the construction organization is responsible for:

- for improper performance or non-performance of their official duties provided for by this job description - within the limits determined by the current labor legislation of the Russian Federation;

- for offenses committed in the course of carrying out their activities - within the limits determined by the current administrative and criminal legislation of the Russian Federation;

- for causing material damage to a construction organization - in the manner prescribed by the current labor, civil and criminal legislation of the Russian Federation;

- for [fill in as appropriate].

5.2. The head of a construction organization is personally liable for the consequences of an unreasonable decision taken by him, which entailed a violation of the safety of property, its misuse or other damage to the organization.

5.3. The head of a construction organization, who unfairly uses the property and funds of the organization entrusted to him in his own interests or in the interests of those opposite to the interests of the founders (owners), shall be liable within the limits established by the civil, criminal, administrative legislation of the Russian Federation.

5.4. [Enter as required].

The job description was developed in accordance with [name, number and date of the document].

Job description of the Deputy Director for Capital Construction

"____" ___________ 20__

Deputy director for capital construction

1. General Provisions

1.1. This job description defines the functional duties, rights and responsibilities of the Deputy Director for Capital Construction [Name of organization in the genitive case] (hereinafter referred to as the Company).

1.2. The Deputy Director for Capital Construction is appointed and dismissed in accordance with the procedure established by the current labor legislation by order of the head of the Company.

1.3. The Deputy Director for Capital Construction reports directly to [title of immediate supervisor in the dative case] of the Company.

1.4. The Deputy Director for Capital Construction belongs to the category of managers, leads the work of the Company in capital construction and has in his subordination:

  • department of capital construction;
  • engineering and design group.

1.5. The Deputy Director for Capital Construction is responsible for:

  • proper organization of work on capital construction in accordance with the approved programs (plans) of the Company;
  • performance and labor discipline of employees;
  • safety of documents (information) containing information constituting a trade secret of an organization (enterprise), other confidential information, including personal data of the Company's employees;
  • ensuring safe working conditions, maintaining order, complying with fire safety rules in industrial premises.

1.6. Persons with a higher professional (technical) education and at least 5 years of experience in managerial positions in the field of capital construction are appointed to the position of Deputy Director for Capital Construction.

1.7. IN practical activities Deputy Director for Capital Construction should be guided by:

  • legislation, regulatory legal acts, as well as local acts and organizational and administrative documents of the Company regulating capital construction;
  • internal labor regulations;
  • rules of labor protection and safety, ensuring industrial sanitation and fire protection;
  • instructions, orders, decisions and instructions of the head of the Company;
  • this job description.
  • production capacity of the enterprise; fundamentals of production technology of the enterprise;
  • production technology and methods of construction work;
  • building regulations;
  • the procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of capital construction;
  • the procedure for concluding and executing economic and financial contracts;
  • scientific and technological achievements in the relevant industry and the experience of advanced enterprises in the field of capital construction;
  • economics, organization of production, labor and management; rules and norms of labor protection, safety measures, industrial sanitation and fire protection.

1.9. During the temporary absence of the Deputy Director for Capital Construction, his duties are assigned to [deputy position].

2. Job responsibilities

The Deputy Director for Capital Construction performs the following labor functions.

2.1. Ensures the performance of works on capital construction at the enterprise, the targeted and rational use of investment resources, directing funds for the technical re-equipment and reconstruction of the enterprise, their concentration on start-up facilities, reducing the volume of construction in progress.

2.2. He leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.

2.4. Participates in the preparation of business plans in terms of technical re-equipment and increase in production efficiency, in determining the necessary financial resources, including funds from investors, for the construction, design and purchase of equipment, as well as sources of financing for capital investments, contractors for capital construction work in the conditions of market methods of managing.

2.5. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey and construction and installation work, with enterprises for the purchase of materials and equipment.

2.7. Ensures the issuance of all materials necessary for the development of design and estimate documentation for construction and reconstruction facilities.

2.8. Coordinates design assignments and prepares them for approval by higher organizations.

2.9. Organizes the execution of banking operations under concluded agreements with customers and contractors and ensures the submission of the necessary documentation for the construction of facilities, carried out by a contract or economic method, in a timely manner.

2.10. Provides control over the timely issuance of design estimates and other technical documentation for the production of construction works, the targeted use of investment funds, over compliance with the established norms for the duration of construction and the deadlines for putting production capacities and fixed assets into operation, over the timeliness of fulfilling tasks for capital construction, over compliance with the requirements legislation on environmental protection, as well as technical supervision and control over the timing and quality of all construction and installation and other construction works, over their compliance with the approved design and estimate documentation, building codes and rules, standards and specifications, safety standards, production sanitation and fire protection, labor organization requirements.

2.11. Coordinates with the bodies exercising technical supervision on issues related to the installation, testing and registration of equipment at construction sites.

2.12. Controls the spending of funds allocated for the purchase of equipment in accordance with the title list, compliance with storage rules and the quality of conservation of uninstalled equipment.

2.13. Together with contractors, it carries out work on the delivery, acceptance and commissioning of objects completed by construction.

2.14. Promotes the introduction of rationalization proposals and improvements that reduce the cost and reduce construction time, reduce the payback period for capital investments (without reducing the strength of structures and deteriorating the quality of construction work).

2.15. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees employed in subordinate units.

2.16. Organizes work on accounting and reporting on capital construction.

2.17. Supervises the work of the department (management) of capital construction and coordinates the activities of subdivisions subordinate to it.

2.18. The Deputy Director for Capital Construction must work out and submit reporting and other documentation to officials with appropriate powers in a timely manner and in full.

If necessary, the Deputy Director for Capital Construction may be involved in the performance of his duties overtime, by decision of the head of the Company, in the manner prescribed by labor legislation.

3. Rights

3.1. Make decisions in order to properly organize capital construction work, ensure daily activities - on all issues within its competence.

3.2. Submit to the head of the Company their proposals for encouraging (bringing to responsibility) subordinate employees - in cases where their own powers are not enough for this.

3.3. Prepare and submit to the head of the Company their proposals for improving the work of capital construction, its additional personnel, logistics, etc.

3.4. Participate in the work of collegiate management bodies when considering issues related to capital construction.

4. Responsibility and performance evaluation

4.1. The Deputy Director for Capital Construction bears administrative, disciplinary and material (and in some cases provided for by the legislation of the Russian Federation - and criminal) responsibility for:

4.1.1. Non-fulfillment or improper fulfillment of official instructions of the immediate supervisor.

4.1.2. Failure or improper performance of labor functions and the tasks assigned to him.

4.1.3. Unlawful use of the granted official powers, as well as their use for personal purposes.

4.1.4. Inaccurate information about the status of the work entrusted to him.

4.1.5. Failure to take measures to suppress the identified violations of safety regulations, fire and other rules that pose a threat to the activities of the enterprise and its employees.

4.1.6. Failure to enforce labor discipline.

4.2. Evaluation of the work of the Deputy Director for Capital Construction is carried out:

4.2.1. The immediate supervisor - regularly, in the course of the daily implementation by the employee of his labor functions.

4.2.2. Attestation Commission of the enterprise - periodically, but at least once every two years based on the documented results of the work for the evaluation period.

4.3. The main criterion for evaluating the work of the Deputy Director for Capital Construction is the quality, completeness and timeliness of his performance of the tasks provided for by this instruction.

5. Working conditions

5.1. The work schedule of the Deputy Director for Capital Construction is determined in accordance with the internal labor regulations established by the Company.

5.2. In connection with the production need, the Deputy Director for Capital Construction is obliged to go on business trips (including local ones).

5.3. In connection with the production need, the Deputy Director for Capital Construction may be provided with official vehicles to perform his labor functions.

6. Right to sign

6.1. To ensure his activities, the Deputy Director for Capital Construction is granted the right to sign organizational and administrative documents on issues that are part of his functional duties.

Acquainted with the instruction ___________ / ____________ / "__" _______ 20__
(signature)

Job Descriptions

Category Instructions:

Alphabetical Instructions:

Deputy director for capital construction

  • Job description of the Deputy Director for Capital Construction (zip, 23 Kb., rating: 3978)

You can download the job description of the deputy director for capital construction for free. Job Responsibilities Deputy Director for Capital Construction

_____________________________ (Surname, initials)

(name of organization, its ________________________________

organizational and legal form) (director; other person authorized

approve job description)

JOB DESCRIPTION

DEPUTY DIRECTOR FOR CAPITAL CONSTRUCTION

I. General provisions

1.1. This job description establishes the rights, responsibilities and duties of the Deputy Director for Capital Construction _____________________ (hereinafter referred to as the "enterprise"). Institution name

1.2. The Deputy Director for Capital Construction belongs to the category of managers.

1.3. A person appointed to the position of deputy director for capital construction must have a higher professional (technical) education and work experience in managerial positions in the field of capital construction for at least 5 years.

1.4. Appointment to the position of deputy director for capital construction and dismissal from it is carried out on the basis of the order of the director of the enterprise.

1.5. Reports directly to the Deputy Director for Capital Construction

1.6. If the deputy director for capital construction is absent, then temporarily his duties are performed by a person appointed in the prescribed manner, who is responsible for the proper performance of the duties assigned to him.

1.7. In his activities, the Deputy Director for Capital Construction is guided by:

the charter of the enterprise and this job description;

legislative and regulatory documents on the issues of the work performed;

methodological materials relating to relevant issues that are within its competence;

labor regulations;

orders and orders of the director of the enterprise.

1.8. The Deputy Director for Capital Construction should know:

profile, specialization and features of the structure of the enterprise;

prospects for technical and economic development of the enterprise;

production capacity of the enterprise;

fundamentals of production technology of the enterprise;

the procedure for the development and approval of capital construction plans as a section of the business plan of the enterprise;

production technology and methods of construction work;

requirements for the organization of labor in the design of construction projects;

the procedure for financing capital investments and attracting investors;

building regulations;

legislative and regulatory legal acts that determine the direction of development of the relevant industry;

administrative and regulatory materials of other bodies on issues of capital construction, as well as those relating to the activities of the enterprise;

the procedure for concluding and executing economic and financial contracts;

scientific and technological achievements in the relevant industry;

experience of advanced enterprises in the field of capital construction;

economics organization of production, labor and management;

rules and norms of labor protection, safety measures, industrial sanitation and fire protection;

rules and procedure for the development and execution of design estimates and other technical documentation;

rules and procedure for keeping records and compiling reports on the activities of the enterprise in the field of capital construction.

II. Functions

The Deputy Director for Capital Construction is entrusted with the following functions:

2.1. Work organization:

- keeping records and compiling established reports;

– to improve the skills of employees of the relevant departments.

2.2. Managing the work on capital construction at the enterprise.

2.3. Ensuring healthy, safe working conditions for subordinates.

2.4. Participation in the preparation of business plans in terms of technical re-equipment.

2.5. Assistance in the implementation of rationalization proposals and improvements.

2.6. Ensuring the introduction of progressive forms of labor organization.

2.7. Coordinating the activities of subordinate departments.

III. Job Responsibilities

The Deputy Director for Capital Construction performs the following duties:

3.1. Provides control:

- for the timeliness of the issuance of design estimates and other technical documentation for the construction work, the targeted use of investment funds;

- for compliance with the established norms for the duration of construction and the timing of the commissioning of production capacities and fixed assets;

- for the timeliness of the fulfillment of tasks for capital construction;

– for compliance with the requirements of the legislation on environmental protection;

- for spending funds allocated for the purchase of equipment in accordance with the title list;

– for compliance with the rules of storage and quality of conservation of uninstalled equipment.

3.2. Provides technical supervision and control over the timing and quality of all construction and installation and other construction works, their compliance with the approved design and estimate documentation, building codes and regulations, standards and specifications, safety standards, industrial sanitation and fire protection, and the requirements of the organization labor.

3.3. Coordinates with the bodies exercising technical supervision on the installation, testing and registration of equipment at construction sites.

3.4. Ensures the performance of capital construction works at the enterprise, the targeted and rational use of investment resources, directing funds for the technical re-equipment and reconstruction of the enterprise, their concentration at launch facilities.

3.5. Provides a reduction in the volume of construction in progress.

3.6. Manages work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods to reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.

3.7. Participates in the preparation of business plans in terms of technical re-equipment and increase in production efficiency, in determining the necessary financial resources, including funds from investors, for the construction, design and purchase of equipment, as well as sources of financing for capital investments, contractors for performing work on capital construction in the conditions of market methods of managing.

3.8. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey, construction and installation work, with enterprises for the purchase of materials and equipment.

3.9. Controls the fulfillment of contractual obligations by design and construction organizations, if necessary, imposes sanctions under the contracts, does not allow the use of building materials, parts and products that increase the cost of construction and do not meet standards and specifications.

3.10. Manages the development of long-term and current plans for capital construction, reconstruction and expansion of the enterprise, as well as plans for the commissioning of fixed production facilities, areas and capacities, housing, communal and cultural facilities, drawing up applications for building materials and equipment for newly commissioned facilities, title lists for construction.

3.11. Ensures the performance of works that are provided for in the title lists, reducing the payback period for capital investments.

3.12. Ensures the issuance of all materials necessary for the development of design and estimate documentation for construction and reconstruction facilities.

3.13. Coordinates design assignments and prepares them for approval by higher organizations.

3.14. Organizes the execution of banking operations under concluded agreements with customers and contractors and ensures the submission of the necessary documentation for the construction of facilities, carried out by a contract or economic method, in a timely manner.

3.15. Carries out work on the delivery, acceptance and commissioning of objects completed by construction, together with contractors.

3.16. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees employed in subordinate units.

3.17. Organizes work on accounting and reporting on capital construction.

3.18. Supervises the work of the department (management) of capital construction and coordinates the activities of subdivisions subordinate to it.

3.19. Promotes the implementation of rationalization proposals and improvements that reduce the cost and reduce construction time and return on capital investments (without reducing the strength of structures and deteriorating the quality of construction work).

IV. The rights

The Deputy Director for Capital Construction has the right to:

4.1. Contact the management of the enterprise:

- with proposals for improving the activities of the enterprise;

- with the requirements of assistance in the performance of their duties and rights.

4.2. Get acquainted with the draft decisions of the management of the enterprise that relate to its activities.

4.3. Sign and endorse documents within their competence.

4.4. Give instructions to the heads of the structural divisions of the enterprise on issues of capital construction.

4.5. Interact with the heads of all structural divisions of the enterprise, as well as contact them with requests for information and documents necessary for the performance of their duties.

V. Responsibility

5.1. In case of causing material damage, within the limits determined by the criminal, civil, labor legislation of the Russian Federation.

5.2. In the event of an offense being committed in the course of carrying out its activities, within the limits determined by the criminal, civil, administrative legislation of the Russian Federation.

5.3. In case of non-performance or improper performance of their official duties, which are provided for by this job description, to the extent determined by the labor legislation of the Russian Federation.

Head of the structural unit: _____________ __________________

(signature) (surname, initials)

Acquainted with the instructions

one copy received: _____________ __________________

JOB DESCRIPTION

___________________________________ (Surname, initials)

(name of company, ________________________

enterprise, etc., his (director or other

legal form) official,

Job description of the deputy director

for capital construction

(name of organization, enterprise, etc.)

» » ____________ 20__ N__________

This job description has been developed and approved for

on the basis of an employment contract with __________________________________________

(name of the position of the person for whom

And in accordance with

this job description has been drawn up)

the provisions of the Labor Code of the Russian Federation and other regulatory

acts regulating labor relations in the Russian Federation.

I. General provisions

1.1. The Deputy Director for Capital Construction belongs to the category of managers. Appointed to the position and dismissed from it by order of the director (manager) of the enterprise.

1.2. A person who has a higher professional (technical) education and at least _________ years of experience in managerial positions in the field of capital construction is appointed to the position of Deputy Director for Capital Construction.

The Deputy Director for Capital Construction reports directly to the Director.

1.3. The Deputy Director for Capital Construction should know:

1) Legislative and regulatory legal acts that determine the direction of development of the relevant industry; administrative and regulatory materials of other bodies on issues of capital construction, as well as those relating to the activities of the enterprise.

2) Prospects for the technical and economic development of the enterprise.

3) Profile, specialization and features of the structure of the enterprise.

4) The production capacity of the enterprise.

5) Fundamentals of production technology of the enterprise.

6) The procedure for the development and approval of capital construction plans as a section of the business plan of the enterprise.

7) Production technology and construction methods.

8) Requirements for the organization of labor in the design of construction projects.

9) The procedure for financing capital investments and attracting investors.

10) Building codes and regulations.

11) The procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of capital construction.

12) The procedure for concluding and executing economic and financial contracts.

13) Scientific and technological achievements in the relevant industry and the experience of advanced enterprises in the field of capital construction.

14) Economics, organization of production, labor and management.

15) Rules and norms of labor protection, safety measures, industrial sanitation and fire protection.

II. Job Responsibilities DEPUTY DIRECTOR FOR CAPITAL CONSTRUCTION

Deputy Director for Capital Construction:

2.1. Provides performance of works on capital construction at the enterprise, targeted and rational use of investment resources. Allocates funds for the technical re-equipment and reconstruction of the enterprise, ensures their concentration on launch facilities, and reduces the volume of construction in progress.

2.2. Leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.

2.3. Manages the development of long-term and current plans for capital construction, reconstruction and expansion of the enterprise, as well as plans for the commissioning of fixed production facilities, areas and capacities, housing, communal and cultural facilities, drawing up applications for building materials and equipment for newly commissioned facilities, title lists for construction, ensures the performance of the work provided for in the title lists, reducing the payback period for capital investments.

2.4. Participates in the preparation of business plans in terms of technical re-equipment and production efficiency, in determining the necessary financial resources, including investors, for the construction, design and purchase of equipment, as well as sources of financing for capital investments, contractors for performing capital construction work in conditions market methods of management.

2.5. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey and construction and installation work, with enterprises - for the purchase of materials and equipment.

2.6. Monitors the fulfillment of contractual obligations by design and construction organizations, if necessary, imposes sanctions under the contracts, does not allow the use of building materials, parts and products that increase the cost of construction and do not meet standards and specifications.

2.7. Ensures the issuance of all materials necessary for the development of design estimates for construction and reconstruction facilities.

2.8. Coordinates design assignments in accordance with the established procedure and prepares them for approval by higher organizations.

2.9. Organizes the execution of banking operations under concluded agreements with customers and contractors and ensures the submission of the necessary documentation for the construction of facilities, carried out by contract or economic methods, in a timely manner.

2.10. Provides control over:

Timely issuance of design estimates and other technical documentation for construction work;

Target use of investment funds;

Compliance with the established norms for the duration of construction and the timing of the commissioning of production capacities and fixed assets;

Timely fulfillment of tasks for capital construction;

Compliance with the requirements of environmental protection legislation.

2.11. Provides technical supervision and control:

For the timing and quality of all construction and installation and other construction works;

For the compliance of construction and installation works with the approved design and estimate documentation, building codes and regulations, standard and technical conditions, safety standards, industrial sanitation and fire protection, and labor organization requirements.

2.12. Coordinates with the bodies exercising technical supervision on issues related to the installation, testing and registration of equipment at construction sites.

2.13. Controls the spending of funds allocated for the purchase of equipment in accordance with the title list, compliance with storage rules and the quality of conservation of uninstalled equipment.

2.14. Together with contractors, it performs the delivery, acceptance and commissioning of completed construction projects.

2.15. Promotes the implementation of rationalization proposals and improvements that reduce the cost and reduce construction time, and also helps to reduce the payback period of capital investments without reducing the strength of structures and deteriorating the quality of construction work.

2.16. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees in subordinate units.

2.17. Organizes work on accounting and reporting on capital construction.

2.18. Supervises the work of the department (management) of capital construction and coordinates the activities of subdivisions subordinate to it.

III. The rights DEPUTY DIRECTOR FOR CAPITAL CONSTRUCTION

The Deputy Director for Capital Construction has the right to:

3.1. Act on behalf of the enterprise, represent its interests in relations with organizations and public authorities on issues of capital construction.

3.2. Request and receive from the heads of structural divisions of the enterprise and specialists the necessary information.

3.3. To check the activities of the structural divisions of the enterprise subordinate to him.

3.4. Give instructions to the heads of the structural divisions of the enterprise on issues of capital construction.

3.5. Within its competence, sign and endorse documents; to issue, under his signature, instructions on the enterprise on issues of capital construction.

3.6. Independently conduct correspondence with the structural divisions of the enterprise, as well as other organizations on issues within its competence.

3.7. Make proposals to the director of the enterprise on bringing officials to material and disciplinary liability based on the results of inspections in accordance with the legislation of the Russian Federation.

IV. Job Responsibility DEPUTY DIRECTOR FOR CAPITAL CONSTRUCTION

The Deputy Director for Capital Construction is responsible for:

4.1. For improper performance or non-performance of their official duties provided for by this job description - to the extent determined by the labor legislation of the Russian Federation.

4.2. For offenses committed in the course of carrying out their activities - within the limits determined by the current administrative, criminal and civil legislation of the Russian Federation.

4.3. For causing material damage - within the limits determined by the current labor and civil legislation of the Russian Federation.

The job description was developed in accordance with ________________

document number and date)

Head of structural (initials, surname)

subdivisions (personnel service) _________________________

Construction director job description

Related Articles

Construction is an organizationally complex process. How to draw up a construction director's instruction correctly, taking into account these difficulties?

From the article you will learn:

The construction of a capital facility is not limited to work on the direct construction of the facility. It is necessary to perform a whole range of works prior to construction, as well as to perform the functionality during time erection of an object that is not directly related to the construction. It is simply impossible for one leader to embrace all these processes with his attention. Therefore, a specific official responsible for the process of direct construction of the object is allocated.

Download documents